WOW! It's really coming together now.
The frame was delayed by a few days, but now its cracking a pace. I stopped by with some drinks and snack for the chippies today and had a chat to the main guy. Apparently they have others jobs to get to so need to finish our, so he said he usually works alone, but he had a son and mate helping him today. In one day they got about ha;f the frame (not including roof) up. I thought it was a good effort, given they had to build it onsite. They also made a saw bench out of scrap lengths, i thought it was rather amsuing!
We are hoping to do the data cabling/conduit at the rough in stage, so hopefully they let us! Has anyone had any experience in this? eg has the building coordinator let you?
We have also noticed that we think the meter box is the wrong colour, it looks like paper bark, not cream, so we will have to get this one changed. It seems to have happened to a few people, reading the blogs online.
here are some progress pics from this week so far.
|
This is at the front door, looking into the house. |
|
looking out the of the window in the main bedroom. Currently there is a lot of building stuff, but i cant wait to get a lovely garde with a weeping cherry in front of this window |
|
view of master bedroom from bedroom door |
|
my dad checking out the rumpus room |
|
Bumble is already making herself at home in the dining room |
|
It was really CUTE, Baxter was sitting at the 'front door' and barking a kid who came to say hello |
|
Boy's delight, planes do loop the loops above our house :) |
|
Our massive laundry! with the extra linen/broom closet on the right hand side. we have about 2m from the back of our house ot the fence, so enough room to put a path to the washing line :) |
|
This is the main living and dining area. Also the bit in the bottom right hand corner in the pantry |
|
our huge walk in wardrobe! |
|
ensuite |
|
front of the house |